picture of Mount Mansfield

​​​​​Jericho Underhill Water District Underhill, VT

Asset Management Grant

2016

Planning Grant Application                          Planning Grant Estimate                                   Asset_Mgmt_Grant_Q&A    

ATTACHMENT C and D                              Attachment E                                                     D B E Form - Subcontractors

Form 430-M and Volunteer Match               Form 430

 

JERICHO-UNDERHILL WATER DISTRICT

P.O. Box 174, Underhill, Vermont 05489

899-3810

 

Dear Customer,

 

The Jericho Underhill Water District applied for and received a grant from the State of Vermont to help in our efforts to provide the best quality water.

A grant requirement is that the Jericho Underhill Water District (JUWD) accurately map the position of over 300 curb stops and valves that provide JUWD service by both GPS and measuring tape triangulation.

Some soil may have to be removed to accomplish the work.  This will be done by shovel to revel buried curb stops. The soil will be replaced after the work is completed.  Additionally JUWD board members or their representatives will need to measure from the curb stop to at least two corners of the residence receiving water service.  Those doing the measuring will be identifiable as wearing JUWD safety vests. There will be no other notification of the work other than this notice. The time to complete the survey is now through late fall.

Curb stops discovered during the survey will be marked with blue paint, a blue survey flag or both. We ask you leave these markers undisturbed until the survey is complete and representative from the UJWD removes them.

 Questions concerning the survey should be directed to the JUWD page at 2016-DWGWPD-AMP-08_signed_aggreement.pdf

Or system operator Marc Maheux at mmaheux@jerichounderhillwater.org or 899-3810

The JUWD thanks you for your cooperation during this project.

 

Joe O’Brien, President

Jason Ritter, Trustee

Steve Jennings, Trustee

                                                                                    Jericho Underhill Water District

                                                                                                Level of Service

Level of Service Goal

Goal/Target Level

Data Needed to Measure Goal

Period of Measurement

 

Provide quality drinking water that meets State and Federal regulations and fire hydrant access

100% of time

Testing requirement

Safe Drinking Water Act Primary Drinking Water Standards

Daily

 

Provide fire hydrant access for over 325 residential and businesses within the District

100% of time

Flow and pressure testing by engineer and JU Fire Department

rate of 40 psi

Yearly

 

Monitor, maintain and repair all system infrastructures and respond to customer needs.

100% of time in a timely manner within 24 hours. 

District employees submit report

To Trustees at monthly meetings

 

Maintain high level of confidence in water quality by completing all monitoring and reporting requirements

Complete all

Testing data

Daily and those required once a year or every three years.

Results published in Consumer Confidence report and in Chief Operator’s monthly reports.  All Published to web site

Maintain consistent chlorine residual of the chlorination system. 

 

98% of time

(minimum of 0.2 mg/L, average of 0.8 mg/L) throughout the distribution system via water line flushing program, as necessary, and proper maintenance

Testing results recorded

Daily

 

Established measures that assure continuous supply of water to customers at a minimum rate of 40 psi.

95% of time

Pressure test results

Twice a year

 

 District will provide high quality water to customers with zero to two complaints per month

Max of two per month

Reports from operators.  Phone and personal conversations recorded

Monthly from staff and customers including chemical use, water disinfection and water production.  . 

 

Customers will receive notification for planned outages.  .

 

100% of the time.  Planned outages will last no longer than 8 hours per event 98% of the time

Communication and record logs by chief operator

24 hours notice

 

Requests for new connections will be completed

 

Fewer than 10 days

Report records by chief operator

Within 10 days of payment of connection fees

 

District employees will maintain their operator licenses and participate in professional development training

100%

Records and State license certificates on file

Yearly

 

Main line breaks will be fixed within 8 hours of discovery 90% of the time. Service line breaks will be fixed within 16 hours of discovery 90% of the time.

Mains – 8 hours.  Service lines – 16 hours 90%

Break identification time and repair time

Monthly

 

Flush all hydrants within the water system twice (Spring and Fall) a year.

Twice a year

      

 

Twice a year

      

(

 

Notice of flushing

Per occurrence

Spring and Fall

 

 

 

The District will assess water loss (leaks)

Quarterly

Compare billing

After each billing period

 

The utility will develop a water loss and drought management plan within 2 years.  

Review loss once a year

The plan will take into consideration the results of the annual water loss.

Quarterly billing data will be compared to amount of water pumped

 

The Utility will use the principals of Asset Management to maintain defined levels of service at the lowest life cycle costs. 

Annual review

The Asset Management Plan will be reviewed and updated on an annual basis

 

 

 

Capital Plan will be updated and reviewed to meet the needs of future developments requiring access to water system

Quarterly review

Requests for service, Development Review Boards applications, and planning commissions’ minutes.

Planning for a 20 year window.

 

 

 

Hi Marc –

This email is a reminder as to administrative procedures and upcoming deliverables related to Jericho-Underhill Water District’s 2016 Drinking Water Asset Management Grant with the Vermont Department of Environmental Conservation.

·         Mid-grant Period Progress Report – A template for completing the Mid-grant Period Progress Report is attached to this email.  This report is due to Kim McKee (kimberley.mckee@vermont.gov) via email by 5:00pm on October 1, 2016.

 

·         Forms and documentation still needed – Last week we corresponded regarding the Disadvantaged Business Enterprise Subcontractor Effort and Utilization Form and Subcontractor Approval Form.  Please forward via email at your earliest convenience or feel free to get in touch if any parts of the forms are unclear.

·         Requesting Payment and Documenting Matching Funds under the Grant – Grantees will complete, sign and submit Form 430 (page 8 in your grant agreement, word version attached) via email to Kim McKee as a scanned PDF to request payment.  Payment can be requested upon submittal of the corresponding deliverable.  Ensure that amount requested, remaining amount and associated totals are filled-in. Performance measures not yet completed will show $0 as Amount Requested and the Budget Amount as the Remaining Amount.

Because match is required to be documented for this grant, Grantees will complete and submit Form 430-M (attached) with Form 430 and indicate the Total Match Documented during completion of a particular performance measure under the appropriate column on Form 430. 


For more detailed instructions, review the Guidance for Electronic Invoice Submittal available at the following link or contact Kim McKee for further clarification: http://dec.vermont.gov/sites/dec/files/aid/Finance/Guidance%20for%20Electronic%20Invoicing.pdf

·         Grant File Checklist - After a grant agreement has been signed by all parties it is necessary for the grantee to maintain a grant file for three years beyond the issue of final payment unless otherwise specified by the grant agreement. Here is a link to a Grant File Checklist which contains the required and potentially applicable materials for a grant file: http://dec.vermont.gov/sites/dec/files/aid/Finance/Grant%20File%20Checklist.pdf

 


As a reminder, due dates in the grant are as follows:

Deliverable

Due Date

Copy of Level of Service Agreement including goals and performance measures.

1-Oct-16

Progress Report

1-Oct-16

Copy of asset inventory including condition assessment.

31-Mar-17

Copy of completed map(s).

31-Mar-17

 

Do not hesitate to get in touch with any questions related to administrative procedures or any aspect of this grant.

 

Regards,

Kim McKee, Grants Management Specialist

[phone]     802-477-3349

[email]      kimberley.mckee@vermont.gov

 

Agency of Natural Resources

Department of Environmental Conservation

Administration & Innovation Division

One National Life Drive, Main 2

Montpelier, VT  05620-3520

 

 

 

 

StateLogo.png

 

Vermont Department of Environmental Conservation                                                                          Agency of Natural Resources

 

Form 430 Request for Funds

Form must be filled out entirely before payment is released

 

Subrecipient Name:  Jericho-Underhill Water District          

 

Grant #:  2016-DWGWPD-AMP-08   Purchase Order #: 6956    Payment#: 1             Amount Requested: $19,920

                                                                 

Performance Measures and Deliverables:

Performance Measure and Submitted Deliverable

Budget Amount

Amount Requested

Remaining Amount

Total Match Documented
(if applicable, use total from Form 430-M)

Match Committed
(if applicable)

1Submit mid-grant period progress report.

$0

$0

$0

$     

 

2 – Develop and submit copy of Level of Service Agreement, including system goals and performance measures.

$3,984

$3,984

$0

$     

 

3 – Create and submit copy of asset inventory, including condition assessment.

$5,536

$5,536

$0

$     

 

4 – Map system assets and submit copy of completed map.

$10,400

$10,400

$0

$     

 

Total

$19,920

$19,920

$0

$5,818

 

$4,980

 

Approvals for Payment

Signed by:

Subrecipient:        _______________________________________________________     Date: _7/19/2017___________________                               

Title:       Chief System Operator_____________________________                                       

The Subrecipient certifies that deliverables being billed on this invoice have been completed as outlined in the grant agreement.
 

State’s Project Manager: _____________________________________________    Date: ____________________

The Grant Manager has verified that deliverables being billed on this invoice have been completed as outlined in the grant agreement.

 

DEC Financial Operations Office: __________________________________________________    Date: ____________________

The DEC Financial Operations Office processed the current invoice for payment on signed date.

AssetName* Location* AssetSize Notes Condition*
BR001 1 BARRETT LANE 3/4   Very Poor
BR002 2 BROOKSIDE DRIVE 3/4 Top of pipe sheared off, full of dirt. Very Poor
DM004 4 DUMAS ROAD 3/4 unable to locate Very Poor
GVVT401 401 Rte 15 8 GV NOT IN USE PART OF AN OLD S Very Poor
MD006 6 MEADOW LANE 3/4   Very Poor
MD025 25 MEADOW LANE 3/4 Couldn't find. Very Poor
MR032 32 MAPLE RIDGE ROAD 3/4 Cap sheared off, pipe plugged with dirt. Very Poor
MR043 43 MAPLE RIDGE ROAD 3/4 Couldn't find curb stop. Very Poor
MR044 44 MAPLE RIDGE ROAD 3/4 May have found curb stop, bent over 90 degrees, very deep. Very Poor
PH022 22 Poker Hill 3/4 stop bit by plow Very Poor
PM013 13 PALMER LANE 3/4 Curb stop bent over, end of pipe is missing. Very Poor
RV007 7 RIVER ROAD 3/4 Under paved driveway? Very Poor
RW093 93 RACEWAY ROAD 3/4 Can't find curb stop. Very Poor
VE001 1 VALLEYS EDGE 3/4 Cap buried 6" below grade, bent 450 Very Poor
VE004 4 VALLEYS EDGE 3/4 Pipe bent, couldn't get wrench down to valve. Very Poor
VE013 13 VALLEYS EDGE 3/4 Pipe sheared off, no cap.  Couldn't get on valve. Very Poor
VE021 21 VALLEYS EDGE 3/4 Pipe sheared off, no cap.  Couldn't get on valve. Very Poor
VE023 23 VALLEYS EDGE 3/4 Pipe sheared off, no cap.  Couldn't get on valve. Very Poor
VE024 24 VALLEYS EDGE 3/4 Cap on pipe, pipe bent over 90o. Very Poor
VT413 271 POKER HILL ROAD 3/4   Very Poor
VT441 441 VT RT 15 3/4   Very Poor
WC003 3 WILLOW LANE 3/4 Cap missing, plugged with dirt. Very Poor
WC012 12 WILLOW LANE 3/4 Can't find curb stop. Very Poor
BR009 9 BROOKSIDE DRIVE 3/4 Can't get cap off Poor
BR013 13 BARRETT LANE 3/4 Couldn't turn vavle. Poor
BR015 15 BROOKSIDE DRIVE 3/4 Couldn't turn vavle. Poor
BR021J 21 BROOKSIDE DRIVE 3/4 Strump of a tree on the edge of the cap.  Can't turn cap at all.  Will need to chop stump out to gain access. Poor
CK009 9 CREEKSIDE 3/4 Bent over couldn't get on valve. Poor
CK010 10 CREEKSIDE 3/4 Full of dirt. Poor
DP004 4 DEPOT STREET 3/4 Whole curb stop turns. Poor
GP010 10 G.A.R. PLACE 3/4 Cap sheared off, pipe packed with dirt. Poor
GVBR000 000 Brookside 8 GV BROOKSIDE DR Poor
GVLL000 000 Liberty Ln 8 GV LIBERTY LANE Poor
GVWC000 000 Willow Ln 8 GV WILLOW ST SO Poor
HR012 12 HARVEST RUN 3/4 Cap missing, hit by lawnmower?. Couldn't get wrench down the pipe. Poor
HYGVWC016 16 Willow Ln 6 GV HYD Poor
JB014 14 JACOBS HILL 3/4 Cap spins but couldn't get it off Poor
JB018 18 JACOBS HILL 3/4 Curb stop unthreaded, couldn't get it back on, replaced it.  Couldn't get down to valve, pipe plugged with dirt. Poor
JB022 22 JACOBS HILL 3/4   Poor
MD011 11 MEADOW LANE 3/4 Couldn't get cap off. Poor
MD014 14 MEADOW LANE 3/4 Couldn't get cap off. Poor
MD017 17 MEADOW LANE 3/4 Couldn't turn valve.. Poor
MR027 27 MAPLE RIDGE ROAD 3/4 Couldn't turn valve. Poor
MR041 41 MAPLE RIDGE ROAD 3/4 Couldn't trun valve. Poor
MR052 52 MAPLE RIDGE ROAD 3/4 Couldn't turn valve. Poor
MR053 53 MAPLE RIDGE ROAD 3/4 Couldn't turn valve. Poor
MR070 70 MAPLE RIDGE ROAD 3/4 Couldn't turn valve. Poor
PA003X 3 PARK STREET 3/4 Couldn't get plug out of cap. Poor
PA007X 7 PARK STREET 3/4 Couldn't get plug out of cap. Poor
PA009X 9 PARK STREET 3/4 Can't turn valve Poor
PH045 45 Poker Hill 3/4   Poor
PK012 12 PARK STREET 3/4 Couldn't turn cap. Poor
PK021 21 PARK STREET 3/4 Couldn't get cap to turn. Poor
PK023 23 PARK STREET 3/4 Hex nut on cap stripped Poor
PK026 26 PARK STREET 3/4 Whole cap came off.  Couldn't get on valve, possibly valve wrench binding in the pipe. Poor
PK034 34 PARK STREET 3/4 Hard time getting wrench down the hole.  Couldn't get on valve dirt pascked around one side of the stem. Poor
PK038 38 PARK STREET 3/4 Pipe plugged with dirt. Poor
PM014 14 PALMER LANE 3/4 Whole curb stop turning. Poor
PM023 23 PALMER LANE 3/4 Couldn't get on valve, wrench stops just below the surface. Poor
RV003 3 RIVER ROAD 3/4 Couldn't get cap off. Poor
RV003A 1 RIVER ROAD 3/4 Couldn''t get cap off. Poor
RV011 11 RIVER ROAD 3/4 Damaged on cap, pipe plugged. Poor
RV016 16 RIVER ROAD 3/4 Couldn't turn valve. Poor
RV020L 20 RIVER ROAD 3/4 Middle School / Metered with compound meter High and Low flow Poor
RV040 40 RIVER ROAD 3/4 Top of pipe wasted, couldn't get wrench down the to valve stem. Poor
RV044 44 RIVER ROAD 3/4 No cap, pipe plugged. Poor
RV048 48 RIVER ROAD 3/4 Couldn't turn valve. Poor
RV058 58 RIVER ROAD 3/4 top of pipe wated, couldn't get wrench on to valve. Poor
RW111 111 RACEWAY ROAD 3/4 Bent, couldn't turn valve. Poor
RW123 123 RACEWAY ROAD 3/4 Pipe turns. Poor
RW127 127 RACEWAY ROAD 3/4 Couldn't get cap off. Poor
RW129 129 RACEWAY ROAD 3/4 Couldn't turn valve. Poor
RW130 130 RACEWAY ROAD 3/4 Wrench didn't reach valve stem. Poor
RW134 134 RACEWAY ROAD 3/4 Cap broken off, pipe plugged. Poor
RW136 136 RACEWAY ROAD 3/4 Can't get cap off Poor
RW140 140 RACEWAY ROAD 3/4 Couldn't get cap off. Poor
RW143 143A RACEWAY RAOD 3/4 Couldn't get on valve curb stop bent. Poor
SU046 64 SUGAR HILL ROAD 3/4 Couldn't get on valve. Poor
VE006 6 VALLEYS EDGE 3/4 Burr inside pipe, copuldn't get wrench past it. Poor
VE007 7 VALLEYS EDGE 3/4 Pipe bent couldn't get wrench down it. Poor
VE008 8 VALLEYS EDGE 3/4 Pipe in weeds, bent over, couldn't get wrench down it. Poor
VE014 14 VALLEYS EDGE 3/4 Pipe bent. Poor
VE020 20 VALLEYS EDGE 3/4 New style curbstop with plug, full of dirt. Poor
VE025 25 VALLEYS EDGE 3/4 Cap on pipe, pipe bent over , can't get on valve. Poor
VE027 27 VALLEYS EDGE 3/4 Pipe cut on one side, prevents wrench from going down inside. Poor
VE030 30 VALLEYS EDGE 3/4 Center of cap has a hole in it, pipe full of dirt. Poor
VE033 33 VALLEYS EDGE 3/4 Cap was on, pipe full of dirt. Poor
VE035 35 VALLEYS EDGE 3/4 Cap bent over 45o, can't get on valve Poor
VF004 PO BOX 88 3/4 Did not find curb stop, either under dog fence or under tree. Poor
VT333 333 VT RT 15 3/4 Hard time getting on valve, could turn valve. Poor
VT340A 340 VT RT 15 3/4 Couldn't turn valve. Poor
VT347 347VT RT 15 3/4 Couldn't trun valve. Poor
VT352 352 VT RT 15 3/4 Couldn't get on valve. Poor
VT354 354 VT RT 15 3/4 Cap missing, pipe plugged. Poor
VT365 39 JERICHO ROAD 3/4 Could trun valve. Poor
VT372X 372X VT RT 15 3/4 Could get cap off west side of 15.  Cap and pipe brolen off on the east side of 15, can't get wrench in pipe. Poor
VT374 374 VT RT 15 3/4 Pipe broken off, can't get wrench in.  New damage this curb stop was ok about a year ago. Poor
VT375 375 VT RT 15 3/4 Couldn't turn valve. Poor
VT376 376 VT RT 15 3/4 Couldn't get cap off. Poor
VT377 377 VT RT 15 3/4 In sidewalk, hole curb stop turning. Poor
VT378 378 VT RT 15 3/4 Couldn't get cap off. Poor
VT379 379 VT RT 15 3/4 Couldn't get cap off. Poor
VT380 380 VT RT 15 3/4 Cap loose, couldn't get on valve. Poor
VT382 203 BEAR HILL ROAD 3/4 Cap broken off, pipe full of dirt. Poor
VT383 383 VT RT 15 3/4 Couldn't turn valve. Poor
VT389 389 VT RT 15 3/4 Whole curb stop turns. Poor
VT401 401 VT RT 15 3/4 Couldn't get on valve,  cap and pipe bushing came off. Poor
VT403 403 VT RT 15 3/4   Poor
VT409 26 COLONIAL SQ 3/4   Poor
VT421 421 VT RT 15 3/4   Poor
VT423 423 VT RT 15 3/4   Poor
WC009 9 WILLOW LANE 3/4 No cap, valve truns hard. End of pipe above ground. Poor
WC011 11 WILLOW LANE 3/4 Couldn't get cap off. Poor
WC013 13 WILLOW LANE 3/4 Valve turns 180 degrees. Poor
BB001A 1 BROOK BEND 3/4   Good
BB001N 1A BROOK BEND 3/4   Good
BR026 26 BROOKSIDE DRIVE 3/4   Good
BR027 27 BROOKSIDE DRIVE 3/4 In the trees, hard to find. Good
CK005 5 CREEKSIDE 3/4   Good
CK007 7 CREEKSIDE 3/4   Good
CK008 8 CREEKSIDE 3/4   Good
DK008 8 DICKINSON STREET 3/4   Good
DK009 9 DICKINSON STREET 3/4   Good
DP001 1 DEPOT STREET 3/4   Good
GVCAHR016 16 Harvest Run 8 GV END OF LN 4FT Good
GVCB000 Control Building 8 GV CONNECTION TO CONTROL BUILD Good
GVCBIN Control Building 4 GV 4FT 9IN TO NU Good
GVCBOUT Control Building 4 GV 4FT 9IN TO NU Good
GVDM008 8 Dumas 8 GV DUMAS EXT 8IN Good
GVDP000 Depot St 8 GV MAIN LN VLV DEPO Good
GVGAR000 GAR PLACE 8 GV MAIN LN VLV GAR Good
GVHR000 Harvest Run 8 GV 8IN HARVEST L Good
GVHR014 14 Harvest Run 8 GV HARVEST LN 6F MAIN LINE VAL Good
GVJH000 000 Jeri Hill 8 GV JH MAIN Good
GVMD000 000 Meadow Ln 8 GV MEADOW LN SO Good
GVPA000N Park St. 8 GV PARK ST SO 4F Good
GVPH045CA 45 Poker Hill 8 GV T PRESSURE 4I Good
GVPH047DR 47 Poker Hill 8 GV TANK DRAIN VLV Good
GVPH047X4I 47 Poker Hill 8 GV 4IN INTO BUILDING Good
GVPHO22 22 Poker Hill 8 GV POKER HILL EX AT  BARRETT L Good
GVPHPH009z 9 Poker Hill 8 GV POKER HIL SO Good
GVPK000 Park St 8 GV 3FT 8IN TO NU Good
GVPM000 000 Palmer 8 GV PALMER ST SO Good
GVRV000 River Rd 8 GV 4FT 4IN TO NU MAIN SO RIVER Good
GVRV052X 52 River Rd 8 GV 4FT 4IN TO NU Good
GVRW000 000 Raceway 8 GV RACEWAY SO Good
GVVT361 361 Rte 15 8 GV RTE 15 SO AT RACEWAY Good
GVVTPA Rte 15 @ Park 8 GV RTE 15 / PARK ST NORTH Good
GVVTPAS RTE15 SOUTH @ Park St. 8 GV RTE 15/PARK ST SOUTH Good
HR004 4 HARVEST RUN 3/4 Valve extension deep had hard time geeting the wrench down to it. Good
HR006 6 HARVEST RUN 3/4   Good
HR008 8 HARVEST RUN 3/4   Good
HYGVDM008 8 Dumas 6 GV HYD ESTIMATE Good
HYGVHR014 14 Harvest Run 6 GV HYD 7FT 1IN T Good
HYGVHR016 16 Harvest Run 6 GV HYD 4FT 9IN T Good
HYGVJH001 1 Jeri Hill 6 GV Good
HYGVJH002 2 Jeri Hill 6 GV Good
HYGVMD011 11 Meadow Ln 6 GV HYD 5FT 7IN T Good
HYGVPA004X 4 Park St 6 GV HYD Good
HYGVPH004 4 Poker Hill 6 GV HYD VLV 4FT 1IN Good
HYGVPH022 22 Poker Hill 6 GV HYD Good
HYGVPH033 33 Poker Hill 6 GV HYD 3FT 8IN T Good
HYGVPM017 17 Palmer 6 GV HYD Good
HYGVRV040 40 River Rd 6 GV HYD 3FT 6IN T Good
HYGVRV048 48 River Rd. 6 GV HYD 4FT 3IN Good
HYGVRW144 144 Raceway 6 GV HYD ESTIMATE Good
HYGVVE006 6 Valleys Edge 6 GV HYD ESTIMATE Good
HYGVVT333 333 Rt 15 6 GV HYD 4FT 4IN T Good
HYGVVT385 385 Rte 15 6 GV HYD Good
HYGVVT414 414 Rte 15 6 GV VALVE Good
HYGVVT428 428 Rt 15 6 GV HYD Good
HYGVVT440 440 Rt 15 6 GV HYD corner Rte. 15 & Meadow Good
LL005 5 LIBERTY LANE 3/4   Good
LL006 6 LIBERTY LANE 3/4   Good
LL007 7 LIBERTY LANE 3/4   Good
LL009 9 LIBERTY LANE 3/4   Good
LL011 11 LIBERTY LANE 3/4   Good
LL012 12 LIBERTY LANE 3/4   Good
LL013 13 LIBERTY LANE 3/4   Good
MD018A 18A MEADOW LANE 3/4 Valve stem deep. Good
MD018B 18B MEADOW LANE 3/4 Valve stem deep. Good
MR007 7 MAPLE RIDGE ROAD 3/4   Good
MR014 14 MAPLE RIDGE ROAD 3/4   Good
MR023 23 MAPLE RIDGE ROAD 3/4   Good
MR024 24 MAPLE RIDGE ROAD 3/4   Good
MR035 35 MAPLE RIDGE ROAD 3/4   Good
PK005 11 THORNTON STREET 3/4   Good
PK014 14 PARK STREET 3/4 Cap slightly damaged, does not affect integrity of the curb stop. Good
PK020 20 PARK STREET 3/4   Good
PM017 17 PALMER LANE 3/4   Good
RV008X 8 RIVER ROAD 3/4 Library Good
RV010H 10 RIVER ROAD 3/4 ID School / metered with compound meter High and low flow Good
RV010L 10 RIVER ROAD 3/4 ID School / metered with compound meter High and low flow Good
RV020X 20 RIVER ROAD 3/4 Middle School / Metered with compound meter High and Low flow Good
RV037 142 MT VIEW ROAD 3/4   Good
RV063 63 RIVER ROAD 3/4   Good
RW100X 100 RACEWAY ROAD 3/4 Under Raceway, difficult to dig to by hand. Good
RW101 101 RACEWAY ROAD 3/4   Good
RW103 103 RACEWAY ROAD 3/4   Good
RW105 105 RACEWAY ROAD 3/4   Good
RW109 109 RACEWAY ROAD 3/4   Good
RW135 135 RACEWAY ROAD 3/4   Good
RW145 145 RACEWAY ROAD 3/4   Good
RW145A 145A RACEWAY ROAD 3/4   Good
SMGVRV052 52 River Rd 2 GV 4FT 6IN TO NU 2" SUB MAIN Good
VE009 9 VALLEYS EDGE 3/4   Good
VE010 10 VALLEYS EDGE 3/4   Good
VE011 11 VALLEYS EDGE 3/4 Buried deep right hand side of driveway. Good
VE015 15 VALLEYS EDGE 3/4   Good
VE017 17 VALLEYS EDGE 3/4   Good
VE019 19 VALLEYS EDGE 3/4   Good
VE026 26 VALLEYS EDGE 3/4   Good
VE031 31 VALLEYS EDGE 3/4   Good
VE034 34 VALLEYS EDGE 3/4   Good
VF006 PO BOX 304 3/4   Good
VF007 7 VT FARMHOUSE 3/4   Good
VT325 325 VT RT 15 3/4   Good
VT331 331 VT RT 15 3/4   Good
VT341 341 VT RT 15 3/4   Good
VT351 351 VT RT 15 3/4   Good
VT355 355 VT RT 15 3/4   Good
VT361 361 VT RT 15 3/4   Good
VT373 373 VT RT 15 3/4   Good
VT385 385 VT RT 15 3/4   Good
VT388 388 VT RT 15 3/4   Good
VT394 394 VT RT 15 3/4   Good
VT395 395 VT RT 15 3/4   Good
VT396 396 VT RT 15 3/4   Good
VT397 397 VT RT 15 3/4 Hard time getting wrench on valve, valve good. Good
VT399 399 VT RT 15 3/4   Good
VT411 411 VT RT 15 3/4   Good
VT417 417 VT RT 15 3/4   Good
VT419 419 VT RT 15 3/4   Good
VT429 429 VT RT 15 3/4   Good
WC014 14 WILLOW LANE 3/4   Good
WC016 16 WILLOW LANE 3/4   Good
WC019 19 WILLOW LANE 3/4   Good
BLBR011 11 Barrett Ln 1.5 GV BR BLOWOFF Fair (Average)
BR011 11 BROOKSIDE DRIVE 3/4 Valve hard to turn. Fair (Average)
BR019 19 BROOKSIDE DRIVE 3/4 Valve hard to turn. Fair (Average)
BR022 22 BROOKSIDE DRIVE 3/4 Curb stop ok, there is a tree growing on top of it. Fair (Average)
DM002 2 DUMAS ROAD 3/4   Fair (Average)
DP006 60 DEPOT STREET 3/4 Valve hard to turn. Fair (Average)
GP007 7 G.A.R. PLACE 3/4 Cap and pipe coupling came off.  Valve turns hard. Fair (Average)
GVBLVT320 320 Rte 15 8 GV BLOW OFF VLV 3FT Fair (Average)
GVCBCENTER Control Building 12 GV 4FT 9IN TO NU Fair (Average)
GVCBWELL 52 River Rd 8 GV WELL AREA Fair (Average)
GVCK000 000 Creekside 8 GV CREEKSIDE RD MAIN VALVE Fair (Average)
GVDM-PH Dumas for Poker Hill 8 GV DUMAS EXT 8IN Fair (Average)
GVPH047X4I 47 Poker Hill 8 GV PRESSURE 4IN Fair (Average)
GVPH047XTA 47 Poker Hill 8 GV 8I Fair (Average)
GVPK034 34 Park St 8 GV Fair (Average)
GVSUBVT391 391 Rte 15 8 GV SUBMAIN FEEDS 392-388 Fair (Average)
GVVE000 000 Valleys Edge 8 GV VALLEY EDGE W Fair (Average)
GVVE001 1 Valleys Edge 8 GV VALLEY EDGE E Fair (Average)
GVVT341 341 Rt 15 8 GV 3FT 11IN TO N SO RTE 15 SOU Fair (Average)
GVVT420Z 420 Rte 15 8 GV FIRE STN Fair (Average)
GVVT428 428 Rte 15 8 GV T TO OLD PUMP Fair (Average)
GVWCCA Willow Ln by bridge 8 GV WILLOW ST 5FT Fair (Average)
HYGVPH016 16 Poker Hill 6 GV HYD 4FT 8IN T Fair (Average)
HYGVPK016 16 Park St 6 GV HYD 5FT 2IN T Fair (Average)
HYGVPK026 26 Park St 6 GV 4FT TO NUT Fair (Average)
HYGVRV010 10 River Rd 6 HYDRANT GATE VALVE ID SCHOOL Fair (Average)
HYGVRV020 20 River Rd. 6 GV HYD 5FT 8IN T TO FIRE HYDRA Fair (Average)
HYGVVE014 14 Vallys Edge 6 GV HYD Fair (Average)
HYGVVE030 30 Valleys Edge 6 GV Fair (Average)
JB016 16 JACOBS HILL 3/4 Cap good.  Pipe bent needed long wrench to get on valve, valve good. Fair (Average)
JH001 412 FARRELL STREET 3/4   Fair (Average)
JH008 412 FARRELL STREET 3/4   Fair (Average)
JH009 412 FARRELL STREET 3/4   Fair (Average)
JH021 412 FARRELL STREET 3/4   Fair (Average)
MD005 5 MEADOW LANE 3/4   Fair (Average)
MD009 9 MEADOW LANE 3/4   Fair (Average)
MD010 10 MEADOW LANE 3/4   Fair (Average)
MD045 45 MEADOW LANE 3/4 Curb stop located on Rte 15 and travels striaght up the hill and is plastic. Fair (Average)
MR029 29 MAPLE RIDGE ROAD 3/4 Valve hard to turn. Fair (Average)
MR038 38 MAPLE RIDGE ROAD 3/4 No stops on valve. Fair (Average)
MR060 60 MAPLE RIDGE ROAD 3/4   Fair (Average)
PH009 9 Poker Hill 3/4   Fair (Average)
PH016 16 Poker Hill 3/4 stop not found Fair (Average)
PH023 23 Poker Hill 3/4 center plug froze in cap Fair (Average)
PK006 6 PARK STREET 3/4 Valve hard to turn. Fair (Average)
PK010 10 PARK STREET 3/4 Valve hard to turn. Fair (Average)
PK016 16 PARK STREET 3/4 Missing cap hard to turn. Fair (Average)
PK037X 37X PARK STREET 3/4 Cemetery hydrant valves / with curb stops / two located in the cemetery grounds Fair (Average)
RV006 6 RIVER ROAD 3/4   Fair (Average)
RW119 119 RACEWAY ROAD 3/4 Cap, broken off, valve turns. Fair (Average)
RW131 131 RACEWAY ROAD 3/4 Hard time, getting on valve, hard to turn. Fair (Average)
RW144 144 RACEWAY ROAD 3/4 Cap broken off, valve turns easily. Fair (Average)
RW146 146 RACEWAY ROAD 3/4 Valve hard to trun. Fair (Average)
TRVT390 390 Rte 15   GV-BOX VT TRACER JOS Fair (Average)
VE029 2626 KITSAP COURT 3/4 Cap damaged, valve is good. Fair (Average)
VT357 357 VT RT 15 3/4 Valve turns hard. Fair (Average)
VT371 371 VT RT 15 3/4 Hard time getting wrench down the pipe, valve stem is deep. Fair (Average)
VT386 386 VT RT 15 3/4 Cap and valve were hard to turn. Fair (Average)
VT393 393 VT RT 15 3/4 Treads on cap wasted, cap sitting on pipe, vlave good.  Inside walk. Fair (Average)
VT426 15 MAIN STREET 3/4   Fair (Average)
VT435 435 VT RT 15 3/4   Fair (Average)
VT437 437 VT RT 15 3/4   Fair (Average)
VT439 439 VT RT 15 3/4   Fair (Average)
WC005 5 WILLOW LANE 3/4 Turns hard. Fair (Average)
BB007 7 BROOK BEND 3/4   Excellent
BR011U 11 BARRETT LANE 3/4   Excellent
DM006 6 DUMAS ROAD 3/4   Excellent
DM008 8 DUMAS ROAD 3/4   Excellent
DM010 10 DUMAS ROAD 3/4   Excellent
DM012 12 DUMAS ROAD 3/4   Excellent
DP002 2 DEPOT STREET 3/4   Excellent
GVBLOFVT364a 364a Rte 15 8 GV 4I TO BLOWOFF Excellent
GVCAVT364a 364a Rte 15 8 GV 8I END Excellent
HR002 2 HARVEST RUN 3/4   Excellent
HR014 14 HARVEST RUN 3/4   Excellent
HYGVJB014 14 Jacob Hill 6 GV HYD 4FT 8IN T Excellent
HYGVJB018 18 Jacob Hill 6 GV HYD 4FT 6IN T Excellent
JB008 8 JACOBS HILL 3/4   Excellent
MD003 3 MEADOW LANE 3/4   Excellent
MR012 12 MAPLE RIDGE 3/4   Excellent
PH003 3 Poker Hill 3/4   Excellent
PH013 13 Poker Hill 3/4   Excellent
PH017 17 Poker Hill 3/4   Excellent
PH019 19 Poker hill 3/4   Excellent
PH035 35 Poker Hill 3/4   Excellent
PH038 38 Poker Hill 3/4   Excellent
PH046 46 Poker Hill 3/4   Excellent
PK022 22 PARK STREET 3/4   Excellent
RV054A 54A RIVER ROAD 3/4   Excellent
RV054B 54B RIVER ROAD 3/4   Excellent
SU046 46 SUGAR HILL ROAD 3/4   Excellent
VE003 3 VALLEYS EDGE 3/4   Excellent
VE005 5 VALLEYS EDGE 3/4   Excellent
VT340B 340 VT RT 15 3/4 same curb stop as A Excellent
VT364 450 WEAVER STREET 3/4   Excellent
VT368 368 VT RT 15 3/4 6" service installed 2016 Excellent
VT390 390 VT RT 15 3/4   Excellent
VT391 391 VT RT 15 3/4   Excellent
VT392 819 NORTH AVE 3/4   Excellent
VT405 405 VT RT 15 3/4   Excellent
VT406 406 VT RT 15 3/4   Excellent
VT407 407 VT RT 15 3/4   Excellent
VT408 408 VT RT 15 3/4   Excellent
VT410 410 VT RT 15 3/4   Excellent
VT412 412 VT RT 15 3/4   Excellent
VT414 414 VT RT 15 3/4   Excellent
VT416 416 VT RT 15 3/4   Excellent
VT420 420 VT RT 15 3/4   Excellent
VT424 424 VT RT 15 3/4   Excellent
VT427 427 VT RT 15 3/4   Excellent
VT428 428 VT RT 15 3/4   Excellent
VT444 444 VT RT 15 3/4   Excellent
VT446 446 VT RT 15 3/4   Excellent
VT447A 447 VT RT 15 3/4   Excellent
VT447B 447 VT RT 15 3/4   Excellent
VT449 449 VT RT 15 3/4   Excellent
VT451 451 VT RT 15 3/4   Excellent
VT468 468 VT Rte 15 3/4   Excellent
VT468 468 VT RT 15 3/4   Excellent